Five precautions for crusher installation

1. The crusher equipment mainframe is fixed on the foundation of the concrete level by anchor bolts, which is beneficial to the crushing efficiency and function of the crusher, and greatly reduces the safety problems of the crusher during the crushing process.

2. the installation should pay attention to the balance between the main body and the ground, so that in the production of the machine, the hammer is effectively broken in the operation of the stone, the balance of force, is conducive to the crusher's mutual wear due to imbalance, the safety increase The life of the crusher.

3. After installation, check whether the equipment is fixed firmly, check whether the bolts in various parts are loose, whether the main engine door is tight, whether the machine shaft can run normally, whether the lubricating oil is filled, etc., and the unreasonable place should be timely deal with.

4. The installed crusher should be equipped with a power cord. It must be equipped according to the requirements of the manual and the rated power of the equipment, as well as the safety of the control switch to ensure normal power supply and safety of the power supply.

5. After the completion of these inspections, carry out the test machine, first open the switch to see if the crusher can operate normally to ensure that there is no problem, and then put the material into further operation. If there is no problem, it is to carry out the load test machine of the crusher. After the test machine is finished, the work can be performed normally.

2019/04/24 14:40:29 2794 次